What did the client need?

Our client, a leading supplier in providing and improving operational efficiency in cleaning, sanitation and disinfection processes, required an ISO Class 8 clean room to house the blending processes of their contamination control solutions.

How did the client benefit?

The cleanroom was designed so that the blending area housed bunded flooring to a depth of 165mm at all points. This safety feature ensured that any potential leaks from the mixing vat were contained – even if the full contents escaped.

How did we help the client?

A monobloc cleanroom utilising an panel system envelope was designed as an extension to an existing cleaning room. Features included walkable ceilings, steel skinned hinged and sliding doors plus a 3m wide rapid roller door.