ISO Class 7 Cleanroom for US Electrical Component Refurbisher

Built because: the client required a clean area for their electronic circuit board refurbishing process
Size: 20.2m²
Type: Hardwall


Class: ISO14644-1 Class 7

Size: 20.2m² (4.8m x 4.2m X 2.5m internal height)  

Internal Inspection Area Size: 5.4m² (3mx 1.8m x 2.5m internal height)

Filtration: 3 HEPA filter fan units (FFU)

Air changes per hour: 130.30 (main area), 124.90 (inspection area)

Additional features:

  • Softwall PVC panel room dividers
  • Internal change/goods transfer area
  • Internal inspection area
  • Vent protectors
  • Cleanroom lighting

Why did the client look for a cleanroom solution?

The Fort Lauderdale US client required a contamination free environment for their electronic circuit board refurbishing process.

How did the client findout about Connect 2 Cleanrooms?

Following research into many US cleanroom suppliers, the client looked overseas for a source of comparison in which they found www.connect2cleanrooms.com. After completing the quick enquiry form on their company web site, they were highly impressed with the response time of less than an hour to get back in touch. With the requirements briefed and the quote provided by Connect 2 Cleanrooms, their focus soon changed from sourcing comparative data to finding the most cost and time effective solution.

Why did the client choose a modular cleanroom solution from Connect 2 Cleanrooms?

Being a start-up company the client required a high quality yet cost effective cleanroom with a short lead time to enable them to get started as soon as possible. A modular cleanroom solution was an obvious choice. With the warehouse space being rented, the client needed a room that could be easily relocated and quick to install as opposed to a traditional style cleanroom which can be very expensive and often require planning permission.

What did the client think of the cleanroom installation process from Connect 2 Cleanrooms?

With the modular cleanroom being dispatched within 2 weeks of drawing approval, the client was very impressed with the response time at every stage of the process from the initial enquiry right through to the installation with the distance being no issue whatsoever. The installation and validation engineers being described as “very friendly and professional” it is no surprise the company has been back in touch stating how pleased they are with the finished product and service.

“Their professionalism and dedication to customer service makes them (your Engineers) represent Connect 2 Cleanrooms in a very positive manner.”

For further information on any of our projects or to speak to us about your requirements, contact us today.

Call:+44(0)1524 813020

Email: info@connect2cleanrooms.com

Website: www.connect2cleanrooms.com

Contact us»

Quick Enquiry